Day 55
July 9th, 2007
All of the SEL stacks QCs have been moved from the third to the second floor. In the next few days, the move of SEL stacks materials QD through QR from the third to the fourth floor will begin.
July 9, 2007
Entry Filed under: Uncategorized
