Day 54
July 5th, 2007
All of the SEL stacks QCs have been moved from the third to the second floor except QC173 A1 A323 through QC 173.4 C65 I44. We hope to have these moved to the second floor by the end of the day Friday, July 6.
The shift of the SEL stacks QD through QR call numbers from the third floor to the fourth floor should start early next week.
July 5, 2007
Entry Filed under: Uncategorized
